{"id":51190,"date":"2024-01-24T11:29:16","date_gmt":"2024-01-24T04:29:16","guid":{"rendered":"https:\/\/www.coteccons.vn\/?p=51190"},"modified":"2024-09-19T11:46:23","modified_gmt":"2024-09-19T04:46:23","slug":"urban-green-command-office-officially-tops-out-the-project","status":"publish","type":"post","link":"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/","title":{"rendered":"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0"},"content":{"rendered":"<p><em>Ho Chi Minh City, on the morning of January 24, 2024, Coteccons officially topped out Urban Green, a project developed by Kusto Home \u2013 a prestigious real estate brand under the multinational Kusto Group. The topping-out ceremony was attended by representatives from the client, the company&#8217;s leadership, the supervision consultant, the project management team, as well as subcontractor partners and suppliers involved in the project.\u00a0<\/em><\/p>\n<p><span data-contrast=\"auto\">Urban Green marks the second collaboration between Coteccons and Kusto Home following the success of the Diamond Island project. Built on a scale of 20,203m\u00b2, including one basement with an area of 12,322m\u00b2 and two 24-story blocks, with a construction density of 32.3%, Urban Green, when completed, will offer a modern and comfortable living space for residents. The total project floor area is 100,746m\u00b2, designed with high standards and over 60 amenities including sports, leisure, and green spaces, promising to create a high-class and convenient urban area that meets the living needs of residents in a hotspot for technology and economic development in Ho Chi Minh City.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\"> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-49463\" src=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6049-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" srcset=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6049-scaled.jpg 2560w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6049-300x200.jpg 300w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6049-1024x683.jpg 1024w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6049-768x512.jpg 768w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6049-1536x1024.jpg 1536w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6049-2048x1365.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-49451\" src=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6579-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" srcset=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6579-scaled.jpg 2560w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6579-300x200.jpg 300w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6579-1024x683.jpg 1024w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6579-768x512.jpg 768w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6579-1536x1024.jpg 1536w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6579-2048x1365.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/span><\/p>\n<p><span data-contrast=\"auto\">As the general contractor for the structural, finishing, and infrastructure works of the Urban Green project, Coteccons faced unique challenges with the 16-20m of weak mud geology, and the necessity to address infill construction, which posed significant safety risks during foundation and basement floor construction. To tackle these challenges, Coteccons engineers implemented a unique construction method using CDM piles ranging from 5-8m in length to replace the weak soil beneath the foundation and basement floor, enhancing the load-bearing capacity of both the foundation and basement floor while ensuring safety during the excavation of the basement pit under difficult geological conditions.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Additionally, during the infrastructure construction, the Site Management Board had to contend with frequent waterlogging on the small road in front of the project, caused by the insufficient capacity of the existing drainage system. To resolve this issue, the Site Management Board had to construct a new drainage line, a new road, and improve the overall situation.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Through experience and professionalism in project management, Coteccons not only achieved safety, quality, and progress but also provided the highest satisfaction for the client The total structural construction progress exceeded the initial commitment by 39 days, a proud achievement for the energetic, passionate, and dedicated team of engineers, demonstrating their determination to achieve the highest goals.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\"> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-49467\" src=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6504-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" srcset=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6504-scaled.jpg 2560w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6504-300x200.jpg 300w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6504-1024x683.jpg 1024w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6504-768x512.jpg 768w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6504-1536x1024.jpg 1536w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6504-2048x1365.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-49455\" src=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6619-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" srcset=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6619-scaled.jpg 2560w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6619-300x200.jpg 300w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6619-1024x683.jpg 1024w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6619-768x512.jpg 768w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6619-1536x1024.jpg 1536w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6619-2048x1365.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-49459\" src=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6756-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" srcset=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6756-scaled.jpg 2560w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6756-300x200.jpg 300w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6756-1024x683.jpg 1024w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6756-768x512.jpg 768w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6756-1536x1024.jpg 1536w, https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6756-2048x1365.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/span><\/p>\n<p><span data-contrast=\"auto\">The Urban Green project is not only the result of a successful collaboration between Coteccons and Kusto Home but also a reflection of Coteccons&#8217; professionalism and dedication to every project we undertake.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Upon handover to residents, Urban Green is expected to become a highlight on the city&#8217;s real estate map, meeting the demand for high-quality, green, and modern living standards.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ho Chi Minh City, on the morning of January 24, 2024, Coteccons officially topped out Urban Green, a project developed by Kusto Home \u2013 a prestigious real estate brand under the multinational Kusto Group. The topping-out ceremony was attended by representatives from the client, the company&#8217;s leadership, the supervision consultant, the project management team, as [&hellip;]<\/p>\n","protected":false},"author":31,"featured_media":49459,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-51190","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-building_futures_news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.13 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0 - COTECCONS<\/title>\n<meta name=\"description\" content=\"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0 - COTECCONS\" \/>\n<meta property=\"og:description\" content=\"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/\" \/>\n<meta property=\"og:site_name\" content=\"COTECCONS\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CotecconsJSC\" \/>\n<meta property=\"article:published_time\" content=\"2024-01-24T04:29:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-19T04:46:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6756-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Phan Th\u1ecb Di\u1ec5m My\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Phan Th\u1ecb Di\u1ec5m My\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/\"},\"author\":{\"name\":\"Phan Th\u1ecb Di\u1ec5m My\",\"@id\":\"https:\/\/www.coteccons.vn\/#\/schema\/person\/72b028613fb2a25b4b7d5a0ddcc457e6\"},\"headline\":\"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0\",\"datePublished\":\"2024-01-24T04:29:16+00:00\",\"dateModified\":\"2024-09-19T04:46:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/\"},\"wordCount\":452,\"publisher\":{\"@id\":\"https:\/\/www.coteccons.vn\/#organization\"},\"articleSection\":[\"COTECCONS NEWS\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/\",\"url\":\"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/\",\"name\":\"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0 - COTECCONS\",\"isPartOf\":{\"@id\":\"https:\/\/www.coteccons.vn\/#website\"},\"datePublished\":\"2024-01-24T04:29:16+00:00\",\"dateModified\":\"2024-09-19T04:46:23+00:00\",\"description\":\"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0\",\"breadcrumb\":{\"@id\":\"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.coteccons.vn\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.coteccons.vn\/#website\",\"url\":\"https:\/\/www.coteccons.vn\/\",\"name\":\"COTECCONS\",\"description\":\"Building Futures\",\"publisher\":{\"@id\":\"https:\/\/www.coteccons.vn\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.coteccons.vn\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.coteccons.vn\/#organization\",\"name\":\"COTECCONS\",\"url\":\"https:\/\/www.coteccons.vn\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.coteccons.vn\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2022\/09\/cropped-Untitled-design.png\",\"contentUrl\":\"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2022\/09\/cropped-Untitled-design.png\",\"width\":512,\"height\":512,\"caption\":\"COTECCONS\"},\"image\":{\"@id\":\"https:\/\/www.coteccons.vn\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/CotecconsJSC\",\"https:\/\/www.youtube.com\/c\/CotecconsGroupChannel\",\"https:\/\/www.linkedin.com\/company\/40873457\/\",\"https:\/\/zalo.me\/205350691575262023\",\"https:\/\/www.instagram.com\/cotecconsjsc\/\",\"https:\/\/www.tiktok.com\/@cotecconsjsc\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.coteccons.vn\/#\/schema\/person\/72b028613fb2a25b4b7d5a0ddcc457e6\",\"name\":\"Phan Th\u1ecb Di\u1ec5m My\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0 - COTECCONS","description":"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/","og_locale":"en_US","og_type":"article","og_title":"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0 - COTECCONS","og_description":"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0","og_url":"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/","og_site_name":"COTECCONS","article_publisher":"https:\/\/www.facebook.com\/CotecconsJSC","article_published_time":"2024-01-24T04:29:16+00:00","article_modified_time":"2024-09-19T04:46:23+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2024\/01\/THUN6756-scaled.jpg","type":"image\/jpeg"}],"author":"Phan Th\u1ecb Di\u1ec5m My","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Phan Th\u1ecb Di\u1ec5m My","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/#article","isPartOf":{"@id":"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/"},"author":{"name":"Phan Th\u1ecb Di\u1ec5m My","@id":"https:\/\/www.coteccons.vn\/#\/schema\/person\/72b028613fb2a25b4b7d5a0ddcc457e6"},"headline":"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0","datePublished":"2024-01-24T04:29:16+00:00","dateModified":"2024-09-19T04:46:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/"},"wordCount":452,"publisher":{"@id":"https:\/\/www.coteccons.vn\/#organization"},"articleSection":["COTECCONS NEWS"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/","url":"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/","name":"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0 - COTECCONS","isPartOf":{"@id":"https:\/\/www.coteccons.vn\/#website"},"datePublished":"2024-01-24T04:29:16+00:00","dateModified":"2024-09-19T04:46:23+00:00","description":"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0","breadcrumb":{"@id":"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.coteccons.vn\/en\/urban-green-command-office-officially-tops-out-the-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.coteccons.vn\/en\/"},{"@type":"ListItem","position":2,"name":"URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT\u00a0\u00a0\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/www.coteccons.vn\/#website","url":"https:\/\/www.coteccons.vn\/","name":"COTECCONS","description":"Building Futures","publisher":{"@id":"https:\/\/www.coteccons.vn\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.coteccons.vn\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.coteccons.vn\/#organization","name":"COTECCONS","url":"https:\/\/www.coteccons.vn\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.coteccons.vn\/#\/schema\/logo\/image\/","url":"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2022\/09\/cropped-Untitled-design.png","contentUrl":"https:\/\/www.coteccons.vn\/wp-content\/uploads\/2022\/09\/cropped-Untitled-design.png","width":512,"height":512,"caption":"COTECCONS"},"image":{"@id":"https:\/\/www.coteccons.vn\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/CotecconsJSC","https:\/\/www.youtube.com\/c\/CotecconsGroupChannel","https:\/\/www.linkedin.com\/company\/40873457\/","https:\/\/zalo.me\/205350691575262023","https:\/\/www.instagram.com\/cotecconsjsc\/","https:\/\/www.tiktok.com\/@cotecconsjsc"]},{"@type":"Person","@id":"https:\/\/www.coteccons.vn\/#\/schema\/person\/72b028613fb2a25b4b7d5a0ddcc457e6","name":"Phan Th\u1ecb Di\u1ec5m My"}]}},"_links":{"self":[{"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/posts\/51190"}],"collection":[{"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/users\/31"}],"replies":[{"embeddable":true,"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/comments?post=51190"}],"version-history":[{"count":3,"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/posts\/51190\/revisions"}],"predecessor-version":[{"id":51193,"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/posts\/51190\/revisions\/51193"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/media\/49459"}],"wp:attachment":[{"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/media?parent=51190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/categories?post=51190"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.coteccons.vn\/en\/wp-json\/wp\/v2\/tags?post=51190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}