URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT   

Ho Chi Minh City, on the morning of January 24, 2024, Coteccons officially topped out Urban Green, a project developed by Kusto Home – a prestigious real estate brand under the multinational Kusto Group. The topping-out ceremony was attended by representatives from the client, the company’s leadership, the supervision consultant, the project management team, as well as subcontractor partners and suppliers involved in the project. 

Urban Green marks the second collaboration between Coteccons and Kusto Home following the success of the Diamond Island project. Built on a scale of 20,203m², including one basement with an area of 12,322m² and two 24-story blocks, with a construction density of 32.3%, Urban Green, when completed, will offer a modern and comfortable living space for residents. The total project floor area is 100,746m², designed with high standards and over 60 amenities including sports, leisure, and green spaces, promising to create a high-class and convenient urban area that meets the living needs of residents in a hotspot for technology and economic development in Ho Chi Minh City. 

As the general contractor for the structural, finishing, and infrastructure works of the Urban Green project, Coteccons faced unique challenges with the 16-20m of weak mud geology, and the necessity to address infill construction, which posed significant safety risks during foundation and basement floor construction. To tackle these challenges, Coteccons engineers implemented a unique construction method using CDM piles ranging from 5-8m in length to replace the weak soil beneath the foundation and basement floor, enhancing the load-bearing capacity of both the foundation and basement floor while ensuring safety during the excavation of the basement pit under difficult geological conditions. 

Additionally, during the infrastructure construction, the Site Management Board had to contend with frequent waterlogging on the small road in front of the project, caused by the insufficient capacity of the existing drainage system. To resolve this issue, the Site Management Board had to construct a new drainage line, a new road, and improve the overall situation. 

Through experience and professionalism in project management, Coteccons not only achieved safety, quality, and progress but also provided the highest satisfaction for the client The total structural construction progress exceeded the initial commitment by 39 days, a proud achievement for the energetic, passionate, and dedicated team of engineers, demonstrating their determination to achieve the highest goals. 

The Urban Green project is not only the result of a successful collaboration between Coteccons and Kusto Home but also a reflection of Coteccons’ professionalism and dedication to every project we undertake. 

Upon handover to residents, Urban Green is expected to become a highlight on the city’s real estate map, meeting the demand for high-quality, green, and modern living standards. 

RELATED POSTS

On May 25, 2026, Coteccons, in collaboration with SSI Securities Corporation, organized a Site Tour program for investment funds at the Metropole MP14 project — one of the key developments where Coteccons serves as the main contractor. The program aimed to provide investors with a more practical perspective on Coteccons’ project execution capabilities, development orientation, and operational activities as the construction industry enters a new growth cycle. During the program, representatives of Coteccons shared insights with investors regarding the context and outlook of Vietnam’s construction industry, the Company’s 9M/FY2026 business performance, management and operational capabilities, quality control systems, and supply chain management for large-scale projects. Coteccons representatives stated that the Company is currently maintaining a healthy backlog, supported by a diversified portfolio of projects across multiple segments, including high-end residential, industrial, infrastructure, and internationally-oriented developments. At the same time, Coteccons continues to focus on enhancing governance capabilities, developing its engineering workforce, and optimizing its ecosystem to ensure high-quality project execution during the next phase of growth. During the discussion session with investors, various topics related to long-term development strategies, risk management, and construction industry trends were openly discussed. Regarding the expansion of foundation construction capabilities, Coteccons shared that its investment in this area stems from the need to strengthen geotechnical engineering capabilities and optimize construction solutions for different soil conditions across Vietnam. This also represents a strategic direction to broaden the Company’s specialized expertise within its construction ecosystem. In terms of raw material price volatility management, Coteccons stated that

Hanoi, May 22, 2026 – At the Closing Ceremony of the 5th Nhan Dan Newspaper Innovation Day – 2026, Coteccons Construction Joint Stock Company (HOSE: CTD) was honored with an Encouragement Award for the initiative “Innovation in the ‘Xây Tết’ and ‘Chuyến tàu hạnh phúc’ (Happiness Train) programs”, while also receiving the “Outstanding Companion Partner” award in recognition of its meaningful contributions in collaborating with Nhan Dan Newspaper to implement community initiatives with strong humanistic values. The awards acknowledge Coteccons’ efforts in promoting innovation associated with social responsibility and sustainable development. Representatives of partner organizations, enterprises, and Nhan Dan Newspaper staff pose for a commemorative photo at the 5th Nhan Dan Newspaper Innovation Day – 2026 Ms. Dinh Thi Ngoc Bich – ESG Subcommittee Member, representing Coteccons, together with other organizations receiving the Encouragement Award for the initiative “Innovation in the ‘Xây Tết’ and ‘Chuyến tàu hạnh phúc’ programs”Mr. Le Quoc Minh, Member of CPV Central Committee, Party Committee Secretary, Editor-in-Chief of Nhan Dan Newspaper, Deputy Head of the Publicity and Education Commission and the Commission for Mass Mobilization under the CPV Central Committee, and President of the Vietnam Journalists Association, presents the “Outstanding Companion Partner” award to Coteccons and other organizations at the event Nhan Dan Newspaper Innovation Day is an annual event organized since 2022 to review innovation initiatives across the organization while honoring projects and ideas with high practical value. Over the years, the program has increasingly affirmed its role as a platform connecting creative ideas

On the morning of May 7, 2026, the Celesta Gold Project was officially launched with a groundbreaking ceremony along Nguyen Huu Tho Avenue, a strategic growth corridor in Ho Chi Minh City. The ceremony was held in a formal setting with the attendance of Mr. Vo Hoang Lam, CEO of Coteccons BU1, together with representatives of the project developers and business partners. Appointed as the main construction contractor for a contract package valued at over VND 1 trillion, the event not only marked the commencement of a new premium residential development in Southern Saigon, but also reaffirmed Coteccons’ proven execution capability in the high‑end real estate segment. At the same time, it highlighted the tangible effectiveness of Coteccons’ “repeat sales” strategy, as international developers continue to entrust the company with large‑scale projects. Celesta Gold, jointly developed by Keppel, Phu Long, and Nomura Real Estate Vietnam, is built on a land area of more than 1.28 hectares, comprising a 25‑storey development with one basement level. The project is designed to deliver 420 luxury residential apartments, complemented by a commercial podium including officetel units and retail space. Oriented toward sustainable development, Celesta Gold applies Singapore’s BCA Green Mark Gold certification and is scheduled for completion within 19 months. The successful award of Celesta Gold holds significant strategic importance, marking the second consecutive “repeat sale” project that Keppel (Singapore) has entrusted to Coteccons in Ho Chi Minh City, following the successful delivery of The Infiniti project. Commenting on this continued partnership, Mr.

84.28-35142277
Contact@Coteccons .vn

GENERAL INQUIRIES​